EasyManuals Logo

Bunn ICB SH Installation & Operating Guide

Bunn ICB SH
17 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #13 background imageLoading...
Page #13 background image
Page 13
PROGRAMMING (cont.)
VIEWING ASSET, SERIAL & SERVICE NUMBER
1. Touch the BUNN logo for 2 seconds to enter the SERVICE ACCESS screen.
2. Select the ADVANCED icon.
3. At the PASSWORD ENTRY screen, select ENTER.
4. At the SERVICE MENU screen, select the SERVICE icon.
5. Select SERVICE NUMBERS to view the asset, serial and service numbers.
NOTE: The asset number will display if it has been setup in programming, otherwise it will not appear.
HOW TO CALIBRATE SPRAYHEAD FLOW RATE
This function allows the operator to test and enter the actual flow rate of water coming out of the sprayhead(s).
The procedure includes a 1-minute dispense of water to determine the actual flow rate. Ensure that the brewer
is heated to brewing temperature before performing a sprayhead calibration.
1. Place a container, accurately graduated with a minimum capacity of 60 ounces, under the funnel.
2. Touch the BUNN logo for 2 seconds to enter SERVICE ACCESS.
3. Select the ADVANCED icon.
4. At the PASSWORD ENTRY screen, select ENTER. (If a password is required, enter the code at this screen).
5. At the SERVICE MENU screen, select the CALIBRATION icon.
4. For Single ICB models, there is only 1 sprayhead to calibrate. For Twin ICB models, there is a left and a right
sprayhead to calibrate. Ensure the container is under the correct sprayhead for calibration.
5. Select the START button to begin a 1-minute dispense of hot water from the sprayhead.
6. The display will show the time remaining for dispense along with the option to stop the dispense if necessary.
The 60-second timer on the display will count down to zero.
7. When the counter reaches zero, the display will change to allow the measured amount of water in the
container to be entered and saved in programming. Measure the amount of water in the container and select
the white box area on the screen to enter the value to match the amount in the container.
8. Select SAVE.
9. The display should now show the actual flow rate of the sprayhead.
10. Repeat steps 1-7 to calibrate the other side. (Twin ICB models only)
HOW TO CALIBRATE BYPASS FLOW RATE
This function allows the operator to test and enter the actual flow rate of water coming out of the bypass. The
procedure includes a 1-minute dispense of water to determine the actual flow rate. Ensure that the brewer is
heated to brewing temperature before performing a bypass calibration.
1. Place a container, accurately graduated with a minimum capacity of 60 ounces, under the funnel.
2. Touch the BUNN logo for 2 seconds to enter SERVICE ACCESS.
3. Select the ADVANCED icon.
4. At the PASSWORD ENTRY screen, select ENTER (If a password is required, enter the code at this screen).
5. At the SERVICE MENU screen, select the CALIBRATION icon.
6. For Single ICB models, there is only 1 bypass to calibrate. For Twin ICB models, there is a left and a right
bypass to calibrate. Ensure the container is under the correct brew station for calibration.
7. Select the START button to begin a 1-minute dispense of hot water from the bypass.
8. The display will show the time remaining for dispense along with the option to stop the dispense if necessary.
The 60-second timer on the display will count down to zero.
9. When the counter reaches zero, the display will change to allow the measured amount of water in the
container to be entered and saved in programming. Measure the amount of water in the container and select
the white box area on the screen to enter the value to match the amount in the container.
050718

Other manuals for Bunn ICB SH

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Bunn ICB SH and is the answer not in the manual?

Bunn ICB SH Specifications

General IconGeneral
BrandBunn
ModelICB SH
CategoryCoffee Maker
LanguageEnglish

Related product manuals