III. Pre-Installation and Boiler Mounting G. General (continued)
b. Gas Piping - Follow instructions in Section
VII “Gas Piping” of the manual for sizing
and installation of an individual boiler. When
common gas piping is sized, insure it will have
adequate capacity for combined input (CFH
gas ow) of the selected stackable boiler
combination.
c. Water Piping and Trim - Follow instructions
in Section VI “Water Piping and Trim” of the
manual for system piping and boiler secondary
piping selection/sizing based on combined
heating capacity and/or gross output of
the selected stackable boiler combination.
Follow instructions of Section VI “Water
Piping and Trim” for each individual boiler trim
installation.
d. Electrical - Follow instructions in Section VIII
“Electrical” of the manual to wire individual
boilers.
Figure 3: Stacking Boiler Attachment Bracket Placement

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Burnham Apex APX399 and is the answer not in the manual?

Burnham Apex APX399 Specifications

General IconGeneral
BrandBurnham
ModelApex APX399
CategoryBoiler
LanguageEnglish

Related product manuals