5.3. Installation diagrams
b.) Installation diagram AQA total 2500
A Water counter shut-off valve
B Outlet valve to garden
C Unit shut-off valve
D Test section
E Rinsing valve
The test section is an easily removable, new pipe section, which should have a pipe length/pipe diameter of
approximately 6:1. It must be tted immediately downstream of the AQA total system.
optional Multiblock