EasyManua.ls Logo

CAME BKS22ALS - User Manual

CAME BKS22ALS
32 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
Loading...
Sliding-gate operators
BKS08AGS
BKS22AGS
BKS12ALS
BKS12AGS
BKS18RGS
BKS18ALS
BKS18AGS
BKS08ALS
BKS22ALS
INSTALLATION MANUAL
FA01295-EN
EN
Italiano
Question and Answer IconNeed help?

Do you have a question about the CAME BKS22ALS and is the answer not in the manual?

CAME BKS22ALS Specifications

General IconGeneral
ModelBKS22ALS
CategoryGate Opener
Power Supply230 V AC
Motor Voltage24 V DC
Operating Temperature-20°C to +55°C
Protection RatingIP44
Power Consumption150 W

Summary

Sliding-Gate Operators Overview

General Installer Precautions

Important Safety Instructions

Key safety guidelines for safe and proper installation of the operator.

Control Board Layout and Terminals

Installation: Site Preparation

Preliminary Operations and Foundation Frame

Preparing the site, digging the pit, and laying the foundation frame.

Anchoring Plate Positioning

Steps for setting up and positioning the anchoring plate in the foundation.

Installation: Anchoring Plate Securing

Securing Plate and Cement Curing

Fastening the anchoring plate and allowing cement to cure properly.

Installation: Operator Setup

Operator Placement and Initial Adjustments

Placing the operator on the plate and initial adjustments for rack/pinion alignment.

Installation: Rack and Pinion Coupling

Fastening the Gate Rack

Procedure for attaching the gate rack to the gate and pinion.

Adjusting Pinion-Rack Mesh

Guidance on adjusting the meshing between the pinion and the rack.

Installation: Final Adjustments

Operator Fastening and Limit Switch Setup

Securing the operator and setting the mechanical limit switches.

Electrical Connections: Basic Wiring

Command and Control Device Integration

Safety Devices: Photocell Integration

Safety Devices: Edge and DXR-DLX Photocell Wiring

Programming: Button Functions and Overview

Programming: Core Functions

Programming: Advanced Settings

Programming: RIO Inputs and User Management

System Management and Commissioning

Getting Started with System Commissioning

Initial steps and safety checks for system commissioning.

Error Message Reference

Paired Operator System Setup

Related product manuals