EasyManua.ls Logo

Carel GDSBI20C00 - Calibration via Modbus Communication

Carel GDSBI20C00
84 pages
Go to English
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
28
ENG
Gas Leakage Detector +0300047IE rel 1.1 - 26.04.2023
Maintenance
4.4 Calibration via Modbus® communication
Place the sensor in clean air and wait for the warm-up phase to be completed at the end of the start-up phase. Enter the Tech-
nician password to access the device (2222 to register 205).
Send 1 to ZeroCalibration (coil 407) to perform the fresh air calibration. If coil 407 is read as 0 after calibration, it means that
calibration was successful.
Send the span gas concentration to the SpanConcentration variable (holding register 655).
Supply gas to the sensor. Use the calibration kit and a 0.5 l/min airow regulator. Wait around 1 minute until the concentration
is stable.
Send 1 to SpanCalibration (coil 408). Read as 0 to conrm the calibration was successful.
4.4.1 Diagram of the calibration procedure
Eseguire
calibrazione
dello zero
Eseguire
calibrazione
span
Eseguire
calibrazione
span
Eseguire
calibrazione
dello zero
Automatico a 0
quando il sensore
viene sostituito
t
Span Calibration
Zero Calibration
Service Due
Days since Service
Sensor Expired
Sensor Days
of Operation
Max days to service
autoset 0
Max days to service
autoset 0
Max Days to Service Max Days to Service Lifetime Sensor

Related product manuals