✔ Item Responsibility Description See Section
Unpacking
Customer, Biomedical
Engineers, Carestream
Field Engineer or
Carestream Service
Provider
Plan the route from the
unpacking location to the
installation location.
A minimum clearance of 3 m
(10 ft) from the front of the
crate is required to unpack the
equipment.
Door widths must be a
minimum of 71 cm (28 in.).
An elevator of adequate size
and capacity must be accessible
where needed.
Installation
Carestream Field Engineer
or Carestream Service
Provider
Installation and setup the
Imager. Installation of DRYVIEW
Laser Imager by customer
biomedical engineers is
supported by some Carestream
countries.
Contact your Carestream Sales
Representative for details.
Installation
Skills Required
InstallationTools
Carestream Field Engineer
or Carestream Service
Provider
Tools needed to install
DRYVIEW Laser Imagers
Installation
Tools
Environmental
Requirements
Air
Conditioning
and Ventilation
Customer, Biomedical
Engineers
Ensure that the proper
operating environment is
provided (temperature,
humidity, altitude, oor
vibration, and oor levelness).
Location
Requirements
Power
Requirements
Customer, Biomedical
Engineers
Provide a dedicated, single-
phase, 15 A power source
within 2.5 m (8 ft) of the left
rear corner of the DRYVIEW
Laser Imager.
Power
Requirements
Checklist
AN9405 3 2024-03-06