5 - INSTRUCTIONS FOR LIFTING AND PLACING THE FEET IN THE OPERATING
POSITION AND FOR SHIPPING
The weights are given on the data plates.
Attach the slings to the sling points indicated by the yellow labels.
We recommend fitting protection between the casing and the hooks to prevent damage to the paintwork.
Never lift horizontal units by the feet.
5.1 - Lifting HORIZONTAL units
The horizontal units marked in the table below with a (!) symbol must be lifted using a spreader beam.
Lifting using a spreader beam
Lifting using a crane
A A A
B
B B
A = B
< 60°
> 60°
E
E
E
E
E
E
1067 1067 1067
HH
H
1023
5.2 - Lifting VERTICAL units
Lifting using a spreader beam Lifting using a crane
E
E
E
1067 1067 1067
H
H
H
1023
FMA
line number
FMA
number
A = B H
E
S module (950 mm) M module (1600 mm) L module (1900 mm)
1
1
1180 1375
950 (!) 1600 (!) 1900
2 1900 3200 3800 (!)
3 2850 4800 (!) 5700 (!)
4 3800 (!) 3200 3800 (!)
5 2850 4800 (!) 5700 (!)
6 1900 - -
2
4
2300 2495
1900 (!) 3200 (!) 3800
6 2850 (!) 4800 5700
8 3800 3200 (!) 3800
10 2850 (!) 4800 5700
12 1900 (!) 3200 (!) 3800
14 2850 (!) 4800 -
6