EasyManua.ls Logo

Carrier 40TGV0481UP - Page 98

Carrier 40TGV0481UP
106 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
No. Part name Procedure Remarks
9
Float switch
assembly
1. Detachment
1) Carry out works of item 1 of 7 and
works from 1) to 5).
2) Remove the fixing screw and the
remove the float switch assembly
(Ø4 × 25, 1 pc.)
2. Attachment
1) Mount the float switch assembly a
before with the fixing screw
NOTE :
When mounting, match hole of the float
switch assembly with projection of the drain
pan.
2) Mount the bell mouth as before.
(Ø4 × 10, 8 pcs.)
3) Following to works of item 2 of 7 and
works from 2) to 5), attach the parts as
before.
Float sFloat switch assembwitch assembly
Fixing screFixing screw (w (Ø4 × 25) 25)
Hole of float switch assembly
Projection of drProjection of drain panain pan
Float switch assembly
Fixing screw (Ø4 × 25)
Projection of drain pan
!
Drain pan
1. Detachment
1) Carry out works of item 1 of 4, item
1 of 6, item 1 of 7 and works from
2) to 5).
2) Remove the fixing screws to remove th
drain pan. (Ø4 × 10, 4 pcs.)
2. Attachment
1) Fix parts as before in order of drain cap
drain pan bell mouth.
2) Following to works of item 2 of 7 and
works from 2) to 5), attach parts as
before.
Fixing screws (Ø4 × 10)
Fixing scre
Fixing screws (ws (Ø4 ×10)10)Fixing screws (Ø4 ×10)
- 98 -

Other manuals for Carrier 40TGV0481UP

Related product manuals