EasyManua.ls Logo

Carrier 40TGV0481UP - Page 99

Carrier 40TGV0481UP
106 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Fixing screw
Fixing band
Fixing screws (Ø4 ×10)
Fixing screws
(Ø4 ×1100))
Fixing screws
(Ø4 × 10)
Piping co
ver
Drain pump stand
Fixing screw
Fixing band
Fixing screws (Ø4 × 10)
Fixing screws
(Ø4 × 10)
Drain pump stand
Fixing band
Heat exchanger
No. Part name Procedure Remarks
"
Heat
exchanger
1. Detachment
1) Recover the refrigerant gas.
2) Carry out work of item 1 of !.
3) Remove refrigerant pipe at indoor unit
side.
4) Remove the fixing screws and the
remove the piping cover. (Ø4 × 10,
3 pcs.)
5) Remove the drain hose from the drain
pump and remove the fixing screws t
remove the drain pump stand.(Ø4 × 8,
3 pcs.)
6) While pushing the heat exchanger,
remove the fixing band, fixing scre
and the heat exchanger. (Ø4 × 8,
3 pcs.)
2. Attachment
1) Mount the heat exchanger with the
fixing band and the fixing screw
(Ø4 × 8, 3 pcs.)
2) Fix the parts as before in order of drain
pump stand piping cover.
3) Connect the refrigerant pipe as before
and then apply vacuuming.
4) Following to work of item 2 of !,
attach the parts as before.
- 99 -

Other manuals for Carrier 40TGV0481UP

Related product manuals