7
2 - INSTALLATION
2.6 - Horizontal or ceiling installation (42SIC or 42SIN)
Using the paper template, trace on the ceiling the position of the two xing brackets and the two rear screws. Using a suitable drill,
make the holes and insert the toggle bolts (2 for each bracket); x the two brackets. Do not over-tighten the screws. Position the
machine on the two brackets, keeping it in position and then x the two screws into the rear toggle bolts, one on each side.
Make sure that there is sufcient inclination of the unit towards the drainage pipe to facilitate the water drainage.
Fully tighten all 6 xing screws.
For installation of the 42NSIC versions, horizontal condensation collection basin accessory kits are available GB0520/GB0524.
The installation of 42SIR (low height with cabinet) units in horizontal position is prohibited.
Carefully check the inclination of the exhaust pipe. Any counterslope of the discharge line can cause water leakage
B B
C
C
DE
B
toggle bolts
C
brackets
D
screws
E
drainage pipe
2.7 - Mounting front grill safety support (42SIC)
In the case in which the cooler-convector is installed in a horizontal position, to guarantee the safety of the cleaning/lter replacement
operations it is obligatory that the two clamps, in the supplied bag together with the instruction manual and the accessories, are mounted
by the installer.
Install braces to prevent the fall of the grid.
- Separate the two clamps;
- open the front grill and completely unscrew the xing screws on the springs;
- x the two clamps, blocking them by retightening the screws;
- x the other part of the clamp to the grill using the supplied screw;
- close the grill.
B
B
C
D
B
Ties
C
Screws xing springs
D
grid