EasyManua.ls Logo

Carrier 50HJ015 - Step 3 - Field Fabricate Ductwork; Step 4 - Make Unit Duct Connections; Step 5 - Trap Condensate Drain

Carrier 50HJ015
18 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Step
3
Field
Fabricate
Ductwork
Secure
all
ducts
to
building
structure.
Use
flexible
duct
connectors
be¬
tween
unit
and
ducts
as
required.
Insulate
and
weatherproof
all
external
ductwork,
joints,
and
roof
openings
with
counter
flashing
and
mastic
in
accordance
with
applicable
codes.
Ducts
passing
through
an
unconditioned
space
must
be
insulated
and
covered
with
a
vapor
barrier.
The
50HJ
units
with
electric
heat
require
a
1-in.
clear¬
ance
for
the
first
24
in.
of
ductwork.
Outlet
grilles
must
not
lie
directly
below
unit
discharge.
Step
4
Make
Unit
Duct
Connections
-
Unit
is
shipped
for
through-the-bottom
duct
connections.
Duct¬
work
openings
are
shown
in
Fig.
5.
Field-fabricated
con¬
centric
ductwork
may
be
connected
as
shown
in
Fig.
6
and
7.
Attach
all
ductwork
to
roof
curb
and
roof
curb
basepans.
Refer
to
installation
instructions
shipped
with
accessory
roof
curb
for
more
information.
Step
5
Trap
Condensate
Drain
See
Fig.
4
and
8
for
drain
location.
Plug
is
provided
in
drain
hole
and
must
be
removed
when
unit
is
operating.
One
3
/4-in.
half
NOTE.
Do
not
drill
in
this
area,
as
damage
to
basepan
may
result
in
water
leak.
Fig.
5
Air
Distribution
Through-the-Bottom
(50HJ024
Shown)
NOTE:
Do
not
drill
in
this
area,
as
damage
to
basepan
may
result
in
water
leak.
Fig.
6
-
Concentric
Duct
Air
Distribution
(50HJ024
Shown)
coupling
is
provided
inside
unit
evaporator
section
for
con¬
densate
drain
connection.
An
8Vi
in
x
3
A-in.
diameter
nip¬
ple
and
a
2-in.
x
3
/4-in.
diameter
pipe
nipple
are
coupled
to
standard
3
/4-in.
diameter
elbows
to
provide
a
straight
path
down
through
holes
in
unit
base
rails
(see
Fig.
9).
A
trap
at
least
4-in.
deep
must
be
used.
Shaded
area
indicates
block-off
panels.
NOTE
^Dimensions
A,
A'
and
B,
B'
are
obtained
from
field-supplied
ceiling
diffuser
Fig.
7
-
Concentric
Duct
Details
Fig.
9
Condensate
Drain
Piping
Details
6

Related product manuals