ComfortVu™ BACnet Thermostat Model Standard TB-HM (Line voltage)Carrier Proprietary and Confidential CARRIER CORPORATION ©2020
Installation and Operation Guide All rights reserved
35
Wiring and DIP Switch configurations 28 to 30 – FC systems - 2-pipe
with Dehumidifier, w/wo Humidifier
Config. 28:
2-Pipe, 1/2/3 Speeds
fan
(1)
, Humidifier,
Dehumidifier
Config. 29:
2-Pipe, 1/2/3 Speeds
fan
(1)
, Cool/Heat PID,
Dehumidifier
Config. 30:
2-Pipe, Fan VFS,
Dehumidifier
Fan medium
(or Economizer
(5)
)
Fan medium
(or Economizer
(5)
)
Economizer
(5)
(option – SW1.6 ON)
Heat element
(2)
(2nd stage heat)
Dehumidifier
(4)
(option - See SW1.3)
(1)
SW3.1, SW3.2 – Fan speeds:
1 speed (Low):
2 speeds(Low and High):
3 speeds(Low, Medium, and High):
SW3.1 = ON, SW3.2 = OFF
SW3.1 = OFF, SW3.2 = ON
SW3.1 = OFF, SW3.2 = OFF
(2)
SW3.4 – 2nd heating stage:
ON = Enable, OFF = Disable
(3)
SW3.5 – Chilled beam option:
ON = Enable chilled beam (fan will not run with cooling)
(4)
SW1.3 = Dehumidification:
ON – Use dehumidifier, OFF – Use reheat for dehumidification
(5)
SW1.6–Terminal 12 operation:
ON = Economizer
OFF = Fan Medium (3 speeds) / Terminal not in use (1/2 speeds/VFS)
Important: Economizer will not work in 3 fan speeds configuration.
See drawing for DIP switch and jumper locations (page 24).
Fan on/off: 110-230VAC, 2.5A max., Fan VFS, PID valves, Hum., Dehum.: 0-10VDC, 0.5mA Not isolated
Control - Heat elements, Cool/Heat valves, Economizer: 110-230VAC, 0.3A max.