EasyManua.ls Logo

Carrier Viento 200 - Evaporator Installation; Evaporator Mounting Steps

Carrier Viento 200
54 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Operation & Service Manual
Carrier Transicold Europe 31/03/07 Viento - Installation/Rev- #22/54
1. Remove the two side panels.
2. Using the adapted tool, put the evaporator facing the fixing
holes previously drilled.
3. Check the minimum distance between the rear of the
evaporator and the box is correct (refer to the chart p6)
4. Tighten the screws.
Installation Evaporator installation

Related product manuals