Operation & Service Manual
Carrier Transicold Europe 31/03/07 Viento - Installation/Rev- #1/54
INSTALLATION
Question and Answer IconNeed help?

Do you have a question about the Carrier Viento 350 and is the answer not in the manual?

Carrier Viento 350 Specifications

General IconGeneral
BrandCarrier
ModelViento 350
CategoryAir Conditioner
LanguageEnglish

Summary

Introduction

Preparation Before Installation

Vehicle Partition

Details on vehicle partition installation and dimensions for evaporator placement.

Box Preparation

Drilling for Roof Top and Cut Mounting

Instructions for drilling holes for roof top and cut mounting, including template use and hole sizes.

Nosemount Drilling

Procedure for drilling holes for nosemount installation, including dimensions and hole locations.

Evaporator Mounting Holes

Steps for marking and drilling fixing holes for the evaporator unit inside the insulated box.

Harness and Hoses Hole

Guidance on drilling the electrical harness and hoses hole inside the box.

Drain Water Hose Hole

Instructions for drilling the drain water hose hole, ensuring proper water drainage.

Mushrooms Installation Procedure

Detailed steps for drilling and installing 'mushrooms' for unit mounting, ensuring watertightness.

Unit Installation

Roof Top and Roof Cut Mounting

Steps for installing the unit on the roof top or through a roof cut, using fixing holes and silent blocks.

Nosemount Installation

Procedure to fix the unit with bolts for nosemount installation.

Evaporator Installation

Hoses

Stocking Recommendations

Guidelines for storing refrigeration hoses to maintain their condition and prevent damage.

Unit Hoses

Mounting Recommendations

Recommendations for correct hose installation, including curve radius and length.

Hose Preparation

Steps for preparing hoses, including cutting, oiling, and fitting double-clic clamps.

Unit Connection

Refrigeration Hoses Connection

Detailed instructions for connecting the four refrigeration hoses (oil return, high pressure, liquid, hot gas).

Evaporator Connection

Refrigeration Hoses

Connecting the suction pressure, liquid line, and hot gas lines to the evaporator.

RAT Sensor Installation

Procedure for installing the RAT sensor using a Ø6 clamp.

Drain Pan Connection

Steps for placing the drain water pipe and connecting drain hoses to evaporator water tubes.

Driver Cab Preparation

Cab Command Harness Fitting

Compressor Connection

Injection Thermostat Installation

Installing the injection thermostat on the compressor high pressure fitting and connecting wires.

Commissioning

Leak Checking

Procedure to check the refrigeration circuit for gas leaks using nitrogen and bubble water.

Unit Vacuum Procedure

Steps for evacuating the circuit, including removing nitrogen and applying the triple evacuation process.

Refrigerant Charging

Process for charging the circuit with refrigerant, noting required tools and quantities for different models.

CPR Adjustment Procedure

Adjusting the Compressor Regulation valve for correct refrigerant flow and unit capacity.

TXV Setting Procedure

Setting the Thermo Expansion valve to control refrigerant flow and ensure correct superheat.