EasyManua.ls Logo

Carrier Viento 350 - Nosemount Drilling

Carrier Viento 350
54 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Operation & Service Manual
Carrier Transicold Europe 31/03/07 Viento - Installation/Rev- #11/54
1. Present the drilling template – not supplied (refer to the
bodybuilder drawing)
2. Mark out fixing and electrical harness and hoses holes.
3. Drill the fixing holes
- drill 10 mm
4. Drill the electrical harness and hoses hole.
Installation Box preparation Drilling Nosemount

Related product manuals