Operation & Service Manual
Carrier Transicold Europe 31/03/07 Viento - Installation/Rev- #8/54
1. Present the drilling template – not supplied - (refer to the
bodybuilder drawing)
2. Mark out the 4 fixing holes and the electrical harness and
hoses hole
3. Drill the fixing holes.
drill ∅ 10 mm
4. For roof top mounting: drill a hole ∅ 80 mm to pass hoses
and harnesses.
Installation Box preparation Drilling Roof top and cut mounting