Carrier Transicold Europe 31/03/07 Viento - Installation/Rev- #16/54
1. From box inside, drill 4 holes 5 mm in the roof through
and through (drill of minimum size 140mm)
2. Countersink with a drill 12,5 mm the 4 tapping drill holes
realized at the previous step.
RECOMMENDATIONS
Take care not to damage the 5 mm drilling of
the box external skin.
3. From box outside, countersink with a circular slitting saw
22 mm.
RECOMMENDATIONS
Take care not to damage the 12,5 mm drilling
of the box internal skin.