EasyManua.ls Logo

Carrier Viento 350 - Roof Top and Roof Cut Mounting; Nosemount Installation

Carrier Viento 350
54 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Operation & Service Manual
Carrier Transicold Europe 31/03/07 Viento - Installation/Rev- #21/54
3. Roof top and roof cut mounting installation:
Drill the 4 fixing holes 10 mm in the bottom cover of
the unit.
4. Nosemount installation:
Use the 4 fixing holes at the rear of the frame (refer to
"Box preparation/Drilling/Nosemount – page11)
5. Using the lifting device (P/N 07-60110-00) put the unit in
place on the 4 silent blocks.
6. Roof top and roof cut mounting installation:
Fix the unit with the 4 silent blocks and bolts delivered in
the packaging.
7. Nosemount installation:
Fix the unit with the 4 bolts.
Installation Unit installation

Related product manuals