EasyManua.ls Logo

Carrier Viento 200 - Driver Cab Preparation; Cab Floor Drilling and Hose Routing

Carrier Viento 200
54 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Operation & Service Manual
Carrier Transicold Europe 31/03/07 Viento - Installation/Rev- #37/54
RECOMMENDATIONS
Before drilling the floor, check the location of
fuel tank, harness and/or tubes.
1. Drill a hole in the cab floor (behind driver or passenger
seat – depends on battery location).
RECOMMENDATIONS
Protect the hole (ex: armoured hose) to avoid
harness damage.
2. Run water drain hose through the floor.
3. Run battery cable through the floor.
4. Run the cab command and ignition cable to the
dashboard.
5. Install a capping (not supplied) to cover the hoses and
harness.
6. Insulate the water drain hose.
Installation Driver cab preparation

Related product manuals