Operation & Service Manual
Carrier Transicold Europe 31/03/07 Viento - Installation/Rev- #34/54
3. Install fitting and connect the SUCTION PRESSURE LINE
hose (∅16 – module 12) to outlet of the CPR valve.
4. Install fitting and connect the HOT GAS LINE hose -with
red label (∅8 – module 6) to the drain pan serpentin inlet.
5. Install fitting and connect the LIQUID LINE (∅8 – module
6) to the Thermostatic Expansion Valve inlet (through the
heat exchanger).
6. Attach all hoses with plastic tie-wraps.
Installation Evaporator connection Refrigeration hoses