Fig. 110 — EconoMi$er
®
IV Wiring
Step 11 — Adjust Factory-Installed Options
SMOKE DETECTORS
Smoke detector(s) will be connected at the Controls Connec-
tions Board, at terminals marked “Smoke Shutdown.” Cut
jumper JMP 3 when ready to energize unit.
ECONOMI$ER IV OCCUPANCY SWITCH
Refer to Fig. 110 for general EconoMi$er IV wiring. External
occupancy control is managed through a connection on the
Controls Connections Board.
If external occupancy control is desired, connect a time clock
or remotely controlled switch (closed for Occupied, open for
Unoccupied sequence) at terminals marked OCCUPANCY.
Cut jumper JMP 2 to complete the installation.
Step 12 — Install Accessories
Available accessories include:
Roof Curb
Thru-base connection kit (must be installed before unit is
set on curb)
Manual outside air damper
Two-position motorized outside air damper
EconoMi$er IV (with control and integrated barometric
relief)
EconoMi$er2 (without control/for external signal and inte-
grated barometric relief)
Power exhaust
Differential dry-bulb sensor (EconoMi$er IV)
Outdoor enthalpy sensor
Differential enthalpy sensor
Electric heaters
Single point kits
Low Ambient Controls
Thermostat / Sensors
•CO
2
sensor
DDC interface (PremierLink controller)
Louvered hail guard
Phase monitor control
Refer to separate installation instructions for information on in-
stalling these accessories.
Step 13 — Check Belt Tension
Measure the belt span length as shown in Fig. 111. Calculate the
required deflection by multiplying the belt span length by
1
/
64
. For
example, if the belt span length is 32 inches:
32 x
1
/
64
=
1
/
2
-in. deflection.
BELT FORCE — DEFLECTION METHOD
Check the belt tension with a spring-force belt force deflection
gage (available from drive belt manufacturer).
1. Place a straightedge along the belt between the two pul-
leys. Measure the distance between the motor shaft and the
blower shaft.
2. Set the tension gage to the desired tension (see Table 1 in
Fig. 111). Place the large O-ring at that point.
3. Press the tension checker downward on the belt until the
large O-ring is at the bottom of the straightedge.
4. Adjust the belt tension as needed.
Adjust belt tension by loosing the motor mounting plate front bolts
and rear bolt (see Fig. 112) and slide the plate towards the fan (to
reduce tension) or away from the fan (to increase tension). Ensure
the blower shaft and motor shaft are parallel to each other (pulleys
aligned). Tighten all bolts securely when finished.
Economizer 2 Position Damper
Unit Without Economizer or
2 Position Damper