EasyManua.ls Logo

Carrier XCT 7 40VD H-7S Series - Page 17

Carrier XCT 7 40VD H-7S Series
161 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Installation
(a) Provide about 1000cc of water to the equipment via air outlet port with the feed pump.
(b) During refrigerating operation, check the drainage system.
Before completing the electrical connection, a gibbose connector should be installed on the drainpipe to provide it with
a water inlet port. Then, if any leakage exists in the piping, inspect it to make the water ow of the drainpipe smooth.
5. Installation of Air Return & Air Exhaust Pipes
To choose the right air return port, air return pipe, air exhaust port and exhaust pipe, please consult service
personnel of Carrier company. Refer the design chart and exterior static pressure values to select the exhaust pipe
with appropriate length and shapes.
Procedures
insert the hose into
20mm-30mm of feed
pipe at bottom
install drainpipe clamp
check drainage via
transparent tube socket
ceiling
suface
special exhaust
port (purchased
at local shop)
air return
pipe
(purchased
at local
shop)
inspection
hole
special air return
pipe (purchased at
local shop) with air
cleaner
exhaust pipe
(purchased
at local shop)
main unit of air
conditioner
pour water into a
gibbose connectordrainpipe
main unit
dismantle
rubber plug,
reinstall it after installation
10
ENGLISH

Related product manuals