EasyManua.ls Logo

CatLink CL-08 - Powering Up and Initial Test Cycle

CatLink CL-08
28 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
2.Power and Initial Test Cycle
Check whether the Trash Liner is properly placed, and properly push the Waste Drawer back to its position.
1
Plug the small end of the power supply into the power input at the back of the Base. Then plug the adapter into
a wall outlet.
2
The unit will peorm a test cycle eve time it is plugged in. DO NOT touch the unit or buttons during this
process. It takes about 3 minutes.
3
Toll free: +1 833 440 2772 Email: suppo@catlink.cn
04

Related product manuals