Schedule Menu:
This is where you can edit your lighting schedule. The schedule is made up of up to 12
periods that will automatically switch in sequence as days go by. Each period is
repeated for a number of days before switching to the next. Periods are divided into
steps. Up to 24 steps can be programmed for each period.
First select the zone for which you want to edit the schedule, then the following screen
is shown:
Period: The first number is the selected period. The second number is the total
number of periods in the schedule.
Days: The first number is the number of days to repeat the selected period. The
second number is the total number of days for the whole schedule.
Edit Period: To switch to the “Edit Period” screen.
Add Period: To add a period to the schedule. Inserts a new period after the current
position. In the above example, with period 1 selected and a total of 2 periods, adding
a period would insert a new period at position 2, and all the following periods would
shift by one position so the old period 2 would become period 3 and so on.
Delete Period: To remove a period from the schedule. Deletes the selected period. In
the above example, period 1 would be deleted and period 2 would become period 1.
>
Edit Schedule
Period: 1/2
Days: 3/10
Edit Period
Add Period
Delete Period
Back