EasyManua.ls Logo

Cedima CF 13.3 B - Page 46

Cedima CF 13.3 B
56 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
46
CEDIMA® • Technical Documentation • All rights reserved according to ISO 16016 • Changes serving technical progress reserved •
Maintenance and care
CF•13.3 B / CF•13.3 B-L
ENGLISH
Saw blade holder ange plugged onto the left side of the
cutting shaft Figure 6.22
ATTENTION
Check the connection of the V-ribbed belt grooved pul-
leys!
After approx. 1/2 h operating time, re-tighten the studs with
the correct torque!
ATTENTION
After no more than 10 operating hours, check the new
V-ribbed belt and re-tension, if necessary!
6.7.3 Engine maintenance
Changing engine oil
Change the engine oil according to the
operating manual of the engine!
DANGER
Risk of injury due to hot engine oil!
Wear appropriate personal protective equipment
(gloves, ...) and use suitable tools (collecting pan, ...)!
Dismount the diamond saw blade so that you can
adjust the joint cutter engine horizontally!
Engine oil drain hose in the support Figure 6.23
Take the engine oil drain hose out of the support thus
draining the used oil (gures 6.23 and 6.24)!
Observe section 4.1!
Engine oil drain hose, taken out of the support Figure 6.24
17
Hold the engine oil drain hose with a second open-
ended spanner!
13

Related product manuals