Models 24012 (E, W, EW, XL, LR, AR)
Installation, Operation and Maintenance
File: 24107
6
Rev. 01.09.01
2. Attach the “L” pins to their locking blocks on the outside of the tracks using the
cables and clamps provided.
3. The alignment lift is supplied with leveling legs. To install these legs raise the lift
to a comfortable working height, and attach the leveling leg assemblies at each
outside corner of the lift using the ½-13 bolts and nuts provided. Lower the lift
onto the leveling legs and level by adjusting the foot at each leg.
4. Install ½-13 bolt and nut (shipping hardware) in the hole in the jack rail at the
front (turn plate) end. This bolt will act as a stop for the rolling oil drain pan or
bridge jack.
Continued Installation for Lube Rack 24012LR
1. Locate and install the center walk platform between the runways at the front end
using the 3/8-16x1 1/4 bolts provided. Attach gate lock to center platform using
3/8-16x11/4 bolts provided.
2. Install gate post at front end of rack using 3/8-16 x 3/4 hex bolts provided. Install
gates and lock rod. Check the gate swing for proper operation, some shimming
of the gate post may be necessary for proper gate swing.
3. Assemble wheels to the ladder using the axle, 5/8” washers and 1/8 x 1 1/4
cotter keys provided. Attach the ladder assembly to the rack using the axle, 5/8"
washers and 1/8 x 1 1/4 cotter keys provided.
4. Install walkway railing in pockets and shim as needed. Assemble ladder railing
to ladder using 3/8-16 x 2 1/4 bolts and nylon lock nuts provided. Install 12
plastic square tube caps.
5. For drive through applications remove front wheel chocks and install drive
through ramps using axles and 1/8 x 1 ½ cotter keys provided.
Anchor Bolt Installation
1. Insure the concrete has had sufficient time to cure - 28 days minimum.
2. Always wear safety glasses.
3. Follow the drill manufacturers safety instruction.
4. Use only solid carbide-tipped drill bits meeting ANSI B94 tip diameter standards.