GB
46
CN
GR
FR
SP
PT
Horizontal flue terminal installation options
LAS flue duct installation options
L max = 5 m
L max = 5 m
L max = 4 m
L max = 4 m
L max = 5 m
Vertical flue terminal installation options
This type of installation can be carried out both on a at or pitched roof by tting a
terminal, an appropriate weathering tile and sleeve, (supplementary ttings supplied
on demand).
L max = 4 m
L max = 4 m L max = 3 mL max = 2 m
For detailed instructions concerning the installation of ttings refer to the technical data
accompanying the ttings.
0503_0906 / CG_1639
0503_0907 / CG_1640
0503_0908 / CG_1641