Do you have a question about the ChargePoint CP6023X-80A-L7 and is the answer not in the manual?
Steps to prepare the pedestal before proceeding with installation.
Instructions for physically mounting the pedestal to the site.
Steps for attaching the station enclosure to wall brackets.
Details essential grounding procedures and safety for North American installations.
Steps to connect the main charging head unit to the station.
Process for station activation and location configuration using installer tools.
Steps to power on the installed and assembled charging station.
| Output Current | 80 A |
|---|---|
| Input Voltage | 208-240 VAC |
| Maximum Output Power | 19.2 kW |
| Connector Type | SAE J1772 |
| Product Type | EV Charger |
| Type | Level 2 |
| Mounting | Wall |
| Mounting Type | Wall or Pedestal |
| Operating Temperature | -30°C to 50°C |
| Network Connectivity | Wi-Fi, Ethernet |
| Authentication | Mobile App, RFID |








