EasyManua.ls Logo

ChargePoint CPF50 - User Manual

ChargePoint CPF50
56 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
Loading...
CPF50
Networked Charging Station for Fleet Vehicles
Installation Guide
Question and Answer IconNeed help?

Do you have a question about the ChargePoint CPF50 and is the answer not in the manual?

Summary

Introduction

Site Requirements

Essential criteria for the installation site, including wiring, circuit protection, and metering.

ChargePoint Gateway Requirements

Specifies the proximity and line-of-sight requirements for the ChargePoint Gateway.

Power Management

Explains how ChargePoint Power Management technology allows for more stations than electrical service might otherwise support.

Tools Needed

For Wall Mount Installations

Lists specific tools and materials required for mounting the CPF50 station to a wall.

For Pedestal Mount Installation

Lists specific tools and materials required for mounting the CPF50 station on a pedestal.

Overview of the Installation Process

Check for the Correct Shipping Boxes

Guides users on verifying the number and contents of shipping boxes for their specific CPF50 configuration.

Check the Contents of Each Box

Main Unit

Details the components included in the main unit's shipping box for the CPF50 charging station.

About the Charging Cable

Describes the charging cables, including lengths and specific types for use with CMK systems.

Pedestal

Cable Management Kit (CMK)

Explains the two sizes of CMK (CMK6, CMK8) and their components for managing charging cables.

Mounting Kit

Wall Mount Kit for CMK Systems

Lists components for the wall mount kit used with CMK systems for CPF50.

Single Station Pedestal (Without CMK) Mount Kit

Details the components of the mount kit for a single station pedestal installation without CMK.

Single Station Pedestal With CMK Mount Kit

Details the components of the mount kit for a single station pedestal installation with CMK.

Choose Your Configuration

Wall Mount with no CMK

Directs users to Section 2 for wall mount installations without a CMK.

Wall Mount with CMK

Directs users to Section 3 for wall mount installations with a CMK.

Pedestal Mount

Directs users to Section 4 for pedestal mount installations.

Install a Wall Mount CPF50 Bracket and CMK

Mount the Back Bracket

Instructions for securely mounting the back bracket to the wall for the CMK system.

Prepare the CMK

Steps for preparing the Cable Management Kit (CMK) before mounting it.

Mount the CMK

Guidance on how to position and mount the CMK onto the back bracket.

Install the Lower Sign

Instructions for attaching the lower sign to the CMK assembly.

Install the Pedestal

Mount and Level the Pedestal

Steps for correctly positioning, leveling, and securing the pedestal to the concrete base.

Install Pedestal Covers

Instructions for selecting and installing the correct pedestal covers based on the configuration.

Mount a Single Station Bracket and CMK

Prepare the CMK

Steps for preparing the Cable Management Kit (CMK) before installation.

Mount the Bracket and CMK

Guidance on mounting the bracket and CMK assembly onto the pedestal.

Mount a Dual Station Bracket and CMK

Prepare the CMK

Steps for preparing the Cable Management Kit (CMK) for dual station installation.

Mount the Bracket and CMK

Instructions for mounting the bracket and CMK to the pedestal for dual station setup.

Install the Station and Charging Cable

Mount the Station

Steps for attaching the main unit of the CPF50 charging station to the mounting bracket.

Review the Wiring Diagram

Explains the wiring diagrams for 240 VAC single-phase and 208 VAC three-phase panels.

Connect the Service Wiring

Detailed steps for connecting the service wiring to the charging station's terminal block.

Connect the Charging Cable

Instructions on how to properly connect the charging cable to the station.

Attach the Wire Cover and Faceplate

Steps for securing the wire cover and attaching the faceplate to the charging station.

Prepare the Charging Cable for Use

Guidance on extending, draping, and inserting the charging cable into its holster or CMK.

Complete Station Setup

Power Up

Instructions on powering on the charging station and troubleshooting if it does not power up.

Pinpoint the Station

Steps for pinpointing the station's location using a smartphone and QR code or manual entry.

Start a Charging Session

How to initiate a test charging session using the ChargePoint app after setup.

Document the Radio Group

Instructions for documenting the organization of CPF50 stations with a ChargePoint Gateway using activation labels.

Complete the Checklist

A post-installation checklist for customers and installers to verify proper setup.

ChargePoint Gateway Installation Guide

Specifications

Basic specifications for the ChargePoint Gateway, including power, input, and connectivity.

Requirements

Key requirements for installing the ChargePoint Gateway, such as power and cellular coverage.

Contents of the Box

Lists the components included in the ChargePoint Gateway shipping box.

Required Tools

Lists essential tools needed for installing the ChargePoint Gateway.

Install the Gateway

Step-by-step instructions for physically mounting the ChargePoint Gateway unit.

Connect the Wiring

Details on routing and connecting the service wiring to the ChargePoint Gateway.

Install the Cover

Instructions for aligning and securing the cover onto the main unit of the Gateway.

Power On

Steps to power on the ChargePoint Gateway and interpret the LED status indicators.

Activate the Gateway

Process for preparing the ChargePoint Gateway for activation on the network by pinpointing its location.

ChargePoint CPF50 Specifications

General IconGeneral
ModelCPF50
Output PowerUp to 12.5 kW
Connector TypeSAE J1772
Input Voltage208-240 VAC
Output CurrentUp to 50A
Network ConnectivityWi-Fi, Cellular, Ethernet
Operating Temperature-30°C to 50°C
MountingWall or Pedestal
CertificationsUL, FCC
Efficiency≥ 94%

Related product manuals