Do you have a question about the ChargePoint CPF50 and is the answer not in the manual?
Essential criteria for the installation site, including wiring, circuit protection, and metering.
Specifies the proximity and line-of-sight requirements for the ChargePoint Gateway.
Explains how ChargePoint Power Management technology allows for more stations than electrical service might otherwise support.
Lists specific tools and materials required for mounting the CPF50 station to a wall.
Lists specific tools and materials required for mounting the CPF50 station on a pedestal.
Guides users on verifying the number and contents of shipping boxes for their specific CPF50 configuration.
Details the components included in the main unit's shipping box for the CPF50 charging station.
Describes the charging cables, including lengths and specific types for use with CMK systems.
Explains the two sizes of CMK (CMK6, CMK8) and their components for managing charging cables.
Lists components for the wall mount kit used with CMK systems for CPF50.
Details the components of the mount kit for a single station pedestal installation without CMK.
Details the components of the mount kit for a single station pedestal installation with CMK.
Directs users to Section 2 for wall mount installations without a CMK.
Directs users to Section 3 for wall mount installations with a CMK.
Directs users to Section 4 for pedestal mount installations.
Instructions for securely mounting the back bracket to the wall for the CMK system.
Steps for preparing the Cable Management Kit (CMK) before mounting it.
Guidance on how to position and mount the CMK onto the back bracket.
Instructions for attaching the lower sign to the CMK assembly.
Steps for correctly positioning, leveling, and securing the pedestal to the concrete base.
Instructions for selecting and installing the correct pedestal covers based on the configuration.
Steps for preparing the Cable Management Kit (CMK) before installation.
Guidance on mounting the bracket and CMK assembly onto the pedestal.
Steps for preparing the Cable Management Kit (CMK) for dual station installation.
Instructions for mounting the bracket and CMK to the pedestal for dual station setup.
Steps for attaching the main unit of the CPF50 charging station to the mounting bracket.
Explains the wiring diagrams for 240 VAC single-phase and 208 VAC three-phase panels.
Detailed steps for connecting the service wiring to the charging station's terminal block.
Instructions on how to properly connect the charging cable to the station.
Steps for securing the wire cover and attaching the faceplate to the charging station.
Guidance on extending, draping, and inserting the charging cable into its holster or CMK.
Instructions on powering on the charging station and troubleshooting if it does not power up.
Steps for pinpointing the station's location using a smartphone and QR code or manual entry.
How to initiate a test charging session using the ChargePoint app after setup.
Instructions for documenting the organization of CPF50 stations with a ChargePoint Gateway using activation labels.
A post-installation checklist for customers and installers to verify proper setup.
Basic specifications for the ChargePoint Gateway, including power, input, and connectivity.
Key requirements for installing the ChargePoint Gateway, such as power and cellular coverage.
Lists the components included in the ChargePoint Gateway shipping box.
Lists essential tools needed for installing the ChargePoint Gateway.
Step-by-step instructions for physically mounting the ChargePoint Gateway unit.
Details on routing and connecting the service wiring to the ChargePoint Gateway.
Instructions for aligning and securing the cover onto the main unit of the Gateway.
Steps to power on the ChargePoint Gateway and interpret the LED status indicators.
Process for preparing the ChargePoint Gateway for activation on the network by pinpointing its location.
| Model | CPF50 |
|---|---|
| Output Power | Up to 12.5 kW |
| Connector Type | SAE J1772 |
| Input Voltage | 208-240 VAC |
| Output Current | Up to 50A |
| Network Connectivity | Wi-Fi, Cellular, Ethernet |
| Operating Temperature | -30°C to 50°C |
| Mounting | Wall or Pedestal |
| Certifications | UL, FCC |
| Efficiency | ≥ 94% |







