42
Complete the Checklist
Before leaving the installation site, complete the post-installation checklist.
Customer:
Installer:
Panel ID#_______________________ Breaker #_______________________
Give the checklist and any spare parts (MAC address labels, etc.) to the person responsible for
activating the stations in the ChargePoint application. This completes the installation of the CPF50
station.
Name
Site Address
Contact
Company
Address
Phone
Installer Name
Contact
Earth/ground connection is made to the ground lugs (where applicable).
Service wiring has been fully inserted into the terminal blocks and all electrical
connections are clean and snug.
Electrical enclosures are clean and free of wire strands and metal shavings.
All covers are installed and all fasteners are tightened. The station is fully secured and does
not rock or wiggle.
The LED located at the bottom of the ChargePoint Gateway is solid green. (This can take
up to 20 minutes.)
For stations with a CMK, the charging cables operate smoothly through full extension and
retraction.
The parking area is clean and free of all packaging and debris.
All pinpointing steps from the Installation Guide have been completed.
A white light is displaying around the CPF50 connector dock.
The WiFi LED (on the left side of the main unit’s cover) is solid green. (This can take up to
10 minutes.)