EasyManua.ls Logo

CHART 1000 - Bolting to Floor; Outdoor Installations

CHART 1000
64 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
21
InstallationProduct Manual - Perma-Cyl
®
w/ FlexFill™ Piping Option
Bolting to Floor
The Perma-Cyl tank is equipped with a ange on the
bottom that has four holes for attachment. To ensure a safe
environment, the tank or pallet base should be bolted to the
oor.
1. Place tank in position with gauges facing forward.
2. Mark holes on oor, move tank.
3. Drill holes using the appropriate size masonry bit.
4. Blow out dust and insert masonry anchors.
5. Move tank back into position over holes and install lag
bolts.
6. Tighten bolts.
Figure 6 - Externally Sited/Gas Use Installation
Outdoor Installations
(Any Size)
Required:
Open area
Well ventilated
At or above ground level
Photo 16 - Outdoor Installation

Table of Contents

Related product manuals