Final Installation Checklist
After you have completed installing your system use this checklist to make sure
everything is ready for your guests.
Physical Installation - CheckBox
❑ CheckBox controller unit is connected to power.
❑ CheckBox controller unit is connected to internet connection.
❑ Network connection cable s are not stapled to walls or cable tied to
AC wiring or power lines.
Physical Installation - Mesh Repeaters
❑ Access points are connected to power.
❑ [Outdoor units only] Access points are mounted at least 20 feet off of the ground.
❑ Access points are mounted at least 4 feet away from other antennas.
❑ Serial number of each repeater is noted for labeling by location in mesh display.
System Setup - CheckBox controller
❑ Set administrative password.
❑ Accept access points into network on the Mesh page.
❑ Upload your graphic for Welcome Screen and Tickets.
❑ Set up your Welcome Message.
❑ Change SSID in Network Setup.
❑ Print out user tickets [for systems using tickets].
❑ Set up Free Access [for systems using free access].
❑ Set up PayPal credit card system [for systems using PayPal].