EasyManuals Logo

Check Point Smart-1 225 Installing

Check Point Smart-1 225
9 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
Page #1 background imageLoading...
Page #1 background image
Classification [Protected] P/N:705871 | 1
© 2014 Check Point Software Technologies Ltd. All rights reserved.
For a list of our trademarks, please refer to: http://www.checkpoint.com/copyright.html.
For a list of our Third Party Copyright notices, please refer to: http://www.checkpoint.com/3rd_party_copyright.html
Installing a Smart-1 LOM Card
705871
Protected
2014
This document is for Smart-1 225, Smart-1 3050, and Smart-1 3150 models.
Important
Read the Health and Safety Information in the Getting Started Guide
(http://supportcontent.checkpoint.com/documentation_download?ID=32309).
To protect the appliance and LOM card from electrostatic discharge, make sure that
you are grounded.
We recommend that you use an ESD grounding wrist strap. Connect the grounding
plug on the wrist strap to the chassis grounding point.
Preparing the Appliance
Before you start to install or remove the LOM card, make sure that:
The appliance is in a clean environment and on a level surface.
You can physically access and open the cover of the appliance.
You can connect to the WebUI or CLI.
You have the Check Point LOM card RMA kit.
RMA Kit Contents
FRU Installation Guide
LOM card
Screwdriver
RMA kit sticker
ESD grounding strap (anti-static)

Other manuals for Check Point Smart-1 225

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Check Point Smart-1 225 and is the answer not in the manual?

Check Point Smart-1 225 Specifications

General IconGeneral
Storage2 x 1 TB HDD
RAID LevelRAID 1
Management Ports1 x 10/100/1000 Mbps
Power SupplySingle
Form Factor1U
Network Interfaces8 x 1GbE, 2 x 10GbE SFP+ ports

Related product manuals