EasyManua.ls Logo

ChefsTemp Quad XPro - Page 17

Default Icon
24 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
15
First Probe Ring:
Second Probe Ring:
Step 1:
Slide the rst of the two matching
probe rings over the probe tip.
Step 1:
Holding the second probe ring,
slide probe ring over the probe.
Step 2:
Roll the probe ring over the
metal springs of the probe.
Step 2:
Roll the probe ring over the
PEEK of the probe.
Step 3:
Slide the probe ring down the
cable until it is over the metal springs
of the probe jack. There will be a slight
groove to hold the probe ring in place.
Step 3:
Place the probe ring at the point
where the metal spring and the PEEK meet.

Related product manuals