EasyManua.ls Logo

CircuPool RJ16+ - Installation Checklist

CircuPool RJ16+
24 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
□ Cell Unions installed and glued into pipe work.
□ Threaded Collars on either side of the Cell are hand tight.
□ Flow Switch is installed and oriented properly.
□ Control Module is affixed to wall and wired correctly.
□ Cell Cable and Flow Switch are connected to Control Module.
□ You have checked and confirmed that Control Module switches ON
and OFF concurrently with filter pump, or is energized continuously
for use with variable speed pump.
□ You have checked all connections and joints for leaks.
□ Sufficient salt has been added and fully dissolved and circulated
throughout pool water.
□ Pool has properly balanced water chemistry.
INSTALLATION CHECKLIST