URBAN - URBAN WB
Instruction Manual
45
D
Checkup
After applying new settings, please go to next URL from Charge Point in order 
to check properly connection from the integration chosen:
http://<IP>/services/cpi/log?app=ocpp1.5
If ‘CB boot notification: success’  appears then Charge Point is properly 
connected to the back-end. 
Otherwise, if the message shown is ‘Registering CB in the CS: failed’ then 
check following items:
- Backend URL. Case sensitive. Check all the URL is correct.
- Charge Point ID. Case sensitive. Check if the name entered is same as backend 
expects to receive.
- Connectivity. Check if modem is power up and connected to the HMI screen. 
Ask to the backend provider if any request has been received from the charge 
point (BootNotification, StatusNotification or HeartBeat) after upgrading.
Look especially for the following messages: