General
Site
Requirements
Site
Environment
The
location of
individual
chassis
and
the
layout
of
your
equipment
rack
or
wiring
room
are
extremely important
for
proper
system
operation
Equipment
placed
too
close
together
inadequate
ventilation
and
inaccessible
panels
can
cause
system
malfunctions
and
shutdowns
and
can
make
system
maintenance
difficult
When
planning
your
site
layout
and
equipment
locations
use
the
following precautions
to
help
avoid
equipment
failures
and
reduce
the
likelihood
of
environmentally
caused
shutdowns
If
you
are
currently
experiencing
shutdowns
or
unusually high
errors
with
your
existing
equipment
these
precautions
may
help
you
isolate
the
cause
of
failures
and
prevent
future
problems
Preventive
Site
Configuration
The
following precautions
will
help
you
plan
an
acceptable
operating
environment
for
your
router
and
will
help
you
avoid
environmentally
caused
equipment
failures
Remember
that electrical
equipment
generates
heat
Ambient
air
temperature
might
not
be
adequate
to
cool
equipment
to
acceptable
operating
temperatures
without
adequate
circulation
Ensure
that
the
room
in
which
you
operate
your
system
has
adequate
air
circulation
Always
follow the
ESD-prevention
procedures
in
the section
Preventing
Electrostatic
Discharge
Damage
to
avoid
damage
to
equipment
Damage
from
static
discharge
can cause
immediate
or
intermittent
equipment
failure
Ensure
that
the
chassis
cover
is
secure
The
chassis
is
designed
to
allow
cooling
air
to
flow within
An
open
chassis allows
air
leaks
which
may
in
turn
interrupt
and
redirect
the
flow of
cooling
air
across
internal
components
Equipment
Racks
The
following
tips
will
help
you
plan
an
acceptable
equipment
rack
configuration
Enclosed racks
must
have
adequate
ventilation
Ensure
that
the
rack
is
not
overly
congested
because each
unit
generates
heat
An
enclosed rack should
have
louvered
sides
and
fan
to
provide
cooling
air
When
mounting
chassis
in
an
open
rack
ensure
that
the
rack
frame
does
not
block
the
intake
or
the
exhaust
ports
If
the chassis
is
installed
on
slides
check
the
position
of the chassis
when
it
is
seated
all
the
way
into
the
rack
In
an
enclosed rack
with
ventilation
fan
in
the
top
excessive heat
generated
by equipment
near
the bottom
of the
rack
can
be
drawn
upward
and
into
the intake
ports
of the
equipment
above
Baffles
can
help
to isolate
exhaust
air
from
intake
air
which
also
helps
to
draw
cooling
air
through
the
chassis
The
best
placement
of the
baffles
depends
upon
the
air
flow
patterns
in
the
rack
which
can
be
found
by
trial-and-error
When
equipment
installed
in
rack
fails
particularly
in
an
enclosed
rack
try
operating
the
equipment by
itself
if
possible
Turn
off
other
equipment
in
the
rack
and
in
adjacent
racks
to
allow the
unit
under
test
maximum
of
cooling
air
and
clean
power
Power
Supply
Considerations
Check
the
power
at
your
site
to
ensure
that
you
are
receiving
clean
power
free
of
spikes
and
noise
Install
power
conditioner
if
necessary
Install
proper
grounding
to
avoid
damage
from
lightning
and
power
surges
Preparing
for
Installation
2-3

Other manuals for Cisco 3000 Series

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Cisco 3000 Series and is the answer not in the manual?

Cisco 3000 Series Specifications

General IconGeneral
ModelCisco 3000 Series
PortsVaries by model
Switching CapacityUp to 176 Gbps
Power SupplyInternal or external, varies by model
Layer SupportLayer 2 and Layer 3
Power over EthernetPoE or PoE+
MemoryVaries by model
DimensionsVaries by model
WeightVaries by model
Operating Temperature0° to 45°C (32° to 113°F)
Operating Humidity10% to 85% non-condensing
Uplink InterfacesOptional 1G/10G SFP/SFP+ or 10GBase-T

Related product manuals