Figure 39: Inner Rail Release Clip
Inner rail attached to chassis2Inner rail release clip1
Outer rail attached to rack post3
Step 6 Use the captive screws on the front of the mounting brackets to fully secure the chassis to the rack.
What to do next
Ground the chassis. See Ground the Chassis, on page 52 for the procedure.
Install the FIPS opacity shield if necessary. See Install the FIPS Opacity Shield, on page 76 for the procedure.
Install the cables according to your software configuration as described in the Cisco Firepower 4100 Getting
Started Guide.
Ground the Chassis
Grounding the chassis is required, even if the rack is already grounded. A grounding pad with two threaded
M4 holes is provided on the chassis for attaching a grounding lug. The grounding lug must be Nationally
Recognized Testing Laboratory (NRTL)-listed. In addition, a copper conductor (wires) must be used and the
copper conductor must comply with National Electrical Code (NEC) code for ampacity.
Note
Cisco Firepower 4112, 4115, 4125, and 4145 Hardware Installation Guide
52
Rack-Mount and Ground the Chassis
Ground the Chassis

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Cisco 4112 and is the answer not in the manual?

Cisco 4112 Specifications

General IconGeneral
BrandCisco
Model4112
CategoryControl Unit
LanguageEnglish

Related product manuals