Figure 43: Installing a Pluggable Transceiver Module in the Network Module
Step 5 If the module has a bale-clasp latch, close it to lock the module in place.
Step 6 Remove the dust plugs and save.
Step 7 Connect the transceiver cables.
Figure 44: Network Module with Pluggable Transceiver Modules Installed
Removing Cisco Pluggable Transceiver Modules
Procedure
Step 1 Attach an ESD-preventive wrist strap to your wrist and to an earth ground surface.
Cisco Catalyst 9300 Series Switches Hardware Installation Guide
78
Installing a Network Module
Removing Cisco Pluggable Transceiver Modules