Air filter kit Optional
Air filter (1) for the front door
Cable-management frame brush filters (2)
M3 x 12 mm flat-head Phillips screws (4)
Center-mount kit For Two-Post rack installation
Step 2 Check the contents of each box for damage.
Step 3 If you notice any discrepancies or damage, send the following information to your customer service representative by
email:
Invoice number of the shipper (see the packing slip)
Model and serial number of the missing or damaged unit
Description of the problem and how it affects the installation
Installing the Chassis in a Two-Post Rack
Before you begin
Verify that the chassis shipment is complete and undamaged.
Verify that a two-post rack is installed and secured to the subfloor.
Stability hazard. The rack stabilizing mechanism must be in place, or the rack
must be bolted to the floor before you slide the unit out for servicing. Failure to
stabilize the rack can cause the rack to tip over.
Warning
If there are other devices in the rack, verify that the devices that are heavier than this chassis are installed
below where you are going to install the chassis and lighter devices are installed above where you are
going to install the chassis.
Verify that the data center ground is accessible where you are installing the chassis.
Fully loaded, the chassis can weigh up to 81.7 lb (37.05 kg). You can lighten the chassis for easier moving
by removing a power supply. To determine the full weight of the chassis and the appropriate weight rating
for the mechanical lift, see Weights and Quantities for the Chassis, Modules, Fan Trays, and Power Supplies.
Note
Installing the Switch Chassis
3
Installing the Switch Chassis
Installing the Chassis in a Two-Post Rack