Do you have a question about the Cleveland KGL-100 and is the answer not in the manual?
Key points for safe installation and operation of the equipment.
DANGER, IMPORTANT, CAUTION, SERVICING, and GAS APPLIANCES warnings and guidelines.
Guidelines for reporting and processing shipping damage claims.
Compliance with codes, clearances, ventilation, and gas supply.
Kettle electrical requirements, grounding, and water jacket details.
Verifying operation, gas leaks, power, and safety circuits.
Kettle must be cleaned and sanitized after installation before first use.
Description and function of kettle controls, switches, and indicator lights.
Approximate product temperature settings for kettle operation.
Approximate times for boiling water based on kettle capacity.
Regular cleaning for optimal performance and safe operation.
Prohibited cleaning agents, tools, and methods to protect the kettle.
Understanding factors that cause corrosion and how to prevent it.
Using correct tools and agents to clean stainless steel surfaces.
Specific cleaners for different cleaning tasks and review notes.
List and diagram of parts for the kettle's main control console.
Diagram and parts list for the stationary model gas control assembly.
Diagram and parts list for the tilting model gas control assembly.
Routine checks for kettle components to be performed every six months.
Proper installation and common unsafe modifications of safety valves.
Examples of incorrect safety valve installations to avoid.
Proper placement and wiring of the safety thermostat.
Correct attachment and common bypass methods for the low water probe.
Functionality and proper connection of the operating thermostat and air switch.
Monthly lubrication steps for trunnion housings and gearbox assembly.
Steps for adjusting kettle hinge tension and alignment.
Step-by-step guide to diagnose why the kettle is not heating.
Diagnosing and resolving issues where the kettle fails to reach target temperature.
Troubleshooting steps for slow or delayed burner ignition.
Diagnosing and resolving issues where the kettle temperature exceeds the set point.
Troubleshooting the persistent activation of the low water warning light.
Procedure for venting the kettle when the vacuum gauge is in the 'VENT AIR' zone.
Steps to test for and repair leaks in steam jacketed kettle fittings.
Recommended semi-annual testing of the pressure relief valve.
Steps for flushing debris from the kettle jacket.
Steps for refilling the kettle jacket with solution.
Steps to convert the kettle from natural gas to propane fuel.
List of specific parts required for the gas conversion process.
Wiring diagram for North American models, 110-120V, 60Hz.
Wiring diagram for North American models, 200-240V, 60Hz.
Wiring diagram for CE France models, 200-240V, 50Hz.
Wiring diagram for CE/Japan models, 100-120V, 50Hz.
Wiring diagram for CE England models, 200-240V, 60Hz.
Wiring diagram for North American models, 110-120V, 60Hz.
Wiring diagram for North American models, 200-240V, 60Hz.
Wiring diagram for CE France models, 200-240V, 50Hz.
| Capacity | 100 gallons |
|---|---|
| Power Type | Gas |
| Material | Stainless Steel |
| Control Type | Manual |
| Gas Type | Natural Gas |












Loading...