6
Operate in compliance with safety regulations in force .
For detailed information (dimensions, weight, technical
characteristics etc.) please refer to the “Technical information”
section.
Use single protection devices : gloves, glasses ecc. .
2.1 PRELIMINARY INFORMATION
2.2 DELIVERY CONTROL
2 - RICEPTION
2.3 HANDLING
Before accepting the delivery you have to check:
That the unit hasn’t been damaged during transport.
Check that the materials delivered correspond with that
indicated on the transport document comparing the data
with the identification label ‘A’ positioned on the
packaging.
In case of damage or anomaly:
Write down on the transport document the damage
you found and quote this sentence: "Conditional
acceptance — clear evidence of deficiencies/
damages during transport".
Contact supplier and the carrier by fax and registered
mail with advice of receipt.
Any disputes must be made within the 8 days following the
delivery. Complaints after this period are invalid..
1. Verify unit weight and handling equipment lifting capacity .
2. Identify critical points during handling (disconnected
routes, flights, steps, doors)
3. Use protection to avoid the unit damaging .
4. Lifting brackets
5. Lifting beam with spacers
6. Lifting with spacer bar
7. Align the barycentre to the lifting point
8. Use all the lifting brackets (see "Technical informations -
dimensions)
9. Gradually bring the lifting belts under tension, making sure
they are positioned correctly. .
10. Before handling verify that the unit keeps its balance.
3
1 2
4