Section 2 Installation
2A.PoolPreparation
To achieve optimal performance from the ozone system, the pool
must be as clean as possible to start with.
1. Backwash or clean lters one day before starting the ozone
generator.
2. Superchlorinate pool water using a chlorine based shock
treatment so the water has a sustained 1-3 ppm free chlorine
level.
3. Test pool chemistry and adjust pH between 7.4 and 7.6. Adjust
total alkalinity between 80 and 120 ppm.
4. Run pool ltration continuously for 24 hours prior to starting
ozone system.
2B. Location
The DEL AOP 50 unit is designed for oor mounting. Locate the unit
in a clean, protected area, either indoors or outdoors (preferably
out of direct sunlight). If possible, locate the unit out of reach of
sprinklers or drainage spouts. Allow sucient access for maintenance
(2 ft clearance above and 1 ft around the unit) and all plumbing and
electrical hookups.
Figure 1: Overview
LAMP ACCESS
PANEL
INLET
OUTLET
INDICATOR
LIGHTS
WARNING
LABELS
GROUNDING
LUG
KNOCKOUTS
(
1/2” CONDUIT
)
FUSE
MOUNTING FEET
KNOCKOUTS
(
1/2” CONDUIT
)