EasyManua.ls Logo

Cochlear Baha - 8. Starting Operation - General; Initial Setup and Connections

Cochlear Baha
56 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
English
17
8. Starting operationGeneral
u Connect the mains cable
and foot control.
v Connect the motor cable.
Note the positioning.
w Insert the stand.
Note the positioning.
(maximum load
capacity 1.5 kg)
x Fit the irrigation tubing set.
a) Open the pump arm
b) Insert the tube in the rear
holder. Note the position of
the flange on the tube
c) Pull the tube towards the
front
d) Insert the tube in the front
holder. Note the position of
the flange on the tube
y Close pump arm.
d
a
b
c
Always place the Osscora on a flat level surface.
Ensure that the Osscora can be disconnected easily from the power supply.

Other manuals for Cochlear Baha

Related product manuals