3.3 INSTALLATION PROCEDURES
3.3.1 GOODS INWARDS INSPECTION
This SP-2110 was factory tested, inspected, packed, and delivered to the carrier with utmost care. Do
not accept shipment from carrier which shows damage or shortage until the carrier's agent endorses
a statement of the irregularity on the face of the carrier's receipt. Without documentary evidence, a
claim cannot be processed.
Open and check each package against the packing list. For any shortage, contact Comba Telecom
Systems. Do not remove items from packing materials until installation. This equipment can be either
installed on wall or laid on a table horizontally.
3.3.2 TOOLS
See Appendix for a full list of tools required for installation and maintenance.
3.3.3 PREPARATION
SP-2110 equipment:
z Mounting surface of wall or table capable of supporting chassis’ weight: ≥1.5kg.
z Power outlet within 1.5m.