EasyManua.ls Logo

Compak E5 OD - Page 12

Compak E5 OD
32 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
ORIGINAL INSTRUCTIONS | Ref. quality process 002/03 | v. 12/07/2016 | K06307
10
8.2. Grinder up set
Place the hopper ( ) on the grind regulator ( ) and make sure the bean trap ( )
is in the closed position. Lock the hopper ( ) in place using a at head screw driver
to gently tighten the hopper security screw making it match to the hole at the bean
hopper collar ( ) (Fig. 2).
Remove the hopper lid ( ), ll the hopper with coffee ( ), and replace the lid on the
hopper ( ) (Fig. 3).
Plug in the grinder, and place the main power switch ( ) I - 1 AUTOMATIC / 0 - 0 OFF /
II - 2 MANUAL, AUTOMATIC / OFF / MANUAL or I / OFF / II to position I - 1 AUTOMATIC
, I or AUTOMATIC and open the bean trap ( ) to allow coffee to pass into the grind
chamber.
8.3. Grind adjustment system
8.3.1. Parallel micrometrical system
Rotate the grind regulator ( ) until reaching the grind level desired.
Rotating the grind regulator clockwise will result in a courser grind; turning the
regulator counter clockwise will result in a ner grinder* (Fig. 4).
Once you reach the desired grinding point, you can x the grinding regulation ( )
using the regulation break ( ) (Fig. 5).

Related product manuals