Revised: 15/02/16 31/03/2016
10
VERTICAL FLUE INSTALLATION
1. Connect flue terminal to both flexible flue pipes.
2. Feed both flexible pipes down the flue cavity.
3. Fix flue terminal securely to top of the flue cavity and seal to prevent water entry. Seal with Hi
temperature waterproof silicon sealant prior to cementing to chimney top, pop rivet circular
flange to the collector box. (Chimney installation only).