EasyManua.ls Logo

Crown Xavier X-4KW-M - LCD Setting: General and Basic Configuration; General Setup and Program Navigation; Output Source and Charging Current Settings

Crown Xavier X-4KW-M
52 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
16
LCD Setting
General Setting
After pressing and holding button for 3 seconds, the unit will enter the Setup Mode. Press
button to select setting programs. Press
button to confirm you selection or button to exit.
Setting Programs:
Program Description Selectable option
00 Exit setting mode
Escape
01
Output source priority:
To configure load power
source priority
Utility first (default)
Utility will provide power to the
loads as first priority.
Solar and battery energy will
provide power to the loads only
when utility power is not available.
Solar first
Solar energy provides power to the
loads as first priority.
If solar energy is not sufficient to
power
all connected loads, Utility
energy will supply power to the
loads at the same time.
SBU priority
Solar energy provides power to the
loads as first priority.
If solar energy is not sufficient to
power all connected loads, battery
energy will supply power to the
loads at the same time.
Utility provides power to the loads
only when battery voltage drops to
either low-level warning voltage or
the setting point in program 12.
02
Maximum charging current:
To configure total charging
current for solar and utility
chargers.
(Max. charging current =
utility charging current +
solar charging current)
60A (default)
Setting range is from 10A to 120A.
Increment of each click is 10A.