EasyManua.ls Logo

CTC Union ETU-01A - Operating Procedure

CTC Union ETU-01A
144 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Chapter 3. LCD Operation
28
November 2001
3.3 Operating Procedure
The ETU-01A requires no operator attention once installed,
except for occasional monitoring of the front panel indicators.
Intervention is only required when:
The ETU-01A has to be adapted to new operational
requirements.
Diagnostic loops are required.
The ETU-01A is turned on when its AC power cord is
connected to an AC power outlet and the power switch is turned
to the ON position. The ETU-01A will perform its internal POST
(power on self test) to verify CPU, RAM, ROM and FPGA
integrity. The initial display looks like this:
E
T
U
-
0
1
A
/
S
N
M
P
S
E
L
F
T
E
S
T
After about 2 seconds, the tests will be completed and display:
E
T
U
-
0
1
A
/
S
N
M
P
S
E
L
F
T
E
S
T
O
K
!

Other manuals for CTC Union ETU-01A