Instruction Booklet
13ENGLISH
KHEOS PLUS
EN
5. General operating rules
5.1 Main panel
The following is a description of the unit’s control panel:
Description
1 I/O Main/emergency switch 9 HP (high pressure) valve
2 Control panel 10 New Oil lling tank
3 Esc button 11 Used oil discharge tank
4 OK/Enter button 12 High pressure connection
5 Forward/back/plus/minus buttons 13 Low pressure connection
6 High pressure gauge (30 bar) 14 Refrigerant lters
7 Low pressure gauge (15 bar) 15 Printer (Optional)
8 LP (low pressure) valve
5.2 Operating phases.
Described below are all the steps that the operator must follow to obtain optimal results in perfectly safe conditions, distinguishing
between manual and automatic operation. To check that the unit is operating correctly, an intelligent control device has been
provided to signal faults and warn the operator by means of error messages. An acoustic warning at the beginning of an operation
indicates that the function entered has started in the correct condition, and a second acoustic warning indicates when the operation
has been completed. Before performing the operations described below, to improve system efficiency (in terms of energy and
time) start the vehicle’s engine and let the cooling system run for a few minutes so that the A/C system can reach full power,
i.e. normal operating conditions.
1011
15
1
3
4
5
7 6
9
2
8
1011
12 ->
13->
14